The
experienced BES team will ensure your plant relocation needs are
met with a solution that exceeds your schedule and budgetary requirements.
The BES methodology means a well-planned move that reduces your
down time with faster equipment up-time. Our team's turnkey service
is extremely versatile, and can overcome almost any obstacle.
BES
brings experienced professionals together to get the job done
right.
BES
Offers the Following Services
| |
- Transportation
of all equipment
- Domestic
/ international transfer
- Turnkey
documentation (pre- and post-move)
- Long-
or short-term storage
- Reinstallation
- Fabrication
of special equipment
- Equipment
purchase
- New
equipment integration
- Procurement
/ contract administration
|
- Plant
engineering services
- Tagging
documentation
- Plant
layout / cellular design
- Documentation
of all move details
- Certification
- local, national, or international
- Pre-
or Post-move cleaning
- Painting
of plant or equipment
- Equipment
Refurbishment
- Excess
material and scrap removal
|
Advantages
to Using BES
Budget
Control
You know
the final project cost up front, and you don't have to depend
upon multiple contractors and companies or worry about delays
and project cost increases. BES controls the project from beginning
to end.
Project
Management
By Using
BES plant relocation services, your move and plant relocation
will be handled from the early planning stages to completion
by our experienced team. Our associates have handled small projects
(production cells) as well as larger projects (complete facility
construction), moves across town, across the country, and even
moves that cross borders. The project timetable minimizes equipment
down time and utilizes space at the new site, all by incorporating
Lean Enterprise and Cellular Layout into
the design. All elements of the relocation process are included
in the project plan, which is produced using MS
Project. Several meetings with the client will also be conducted
throughout the project to avoid surprises.
Installantion
/ Integration
We will
prepare the facility to receive the equipment, set and level
the machinery and make all connections. The BES team will also
coordinate any new or special requirements for the facility
such as power, plumbing additions or modifications, and other
infrastructure changes. These requirements will be integrated
into our detailed project plan which includes facility preparation
as a key element of the process.
Accountability
By using
one company to complete the project, your downtime is minimized,
as is the move's impact on your customers. Our skilled tradesmen
are able to move and install multi-load plants within the client's
schedule constraints.
Our
Staff
Our experienced
staff has years of military logistics and planning experience
as well as over 35 years combined commercial industrial experience.
Our riggers and skilled tradesmen have an average experience
of 10+ years.
Access
to Equipment
We have
the equipment to successfully complete any project. Forklifts,
specialized cranes, and an oversized gantry system are all part
of our arsenal, supplemented by a fleet of trucks and long-haul
carriers for multi-week moves. Our access to this equipment
helps us get the job done quickly and efficiently.
High
Safety Standards
BES is
committed to the safety of our employees, our customers, and
their equipment and facilities.
We have
a documented safety program policy. We perform pre-employment
drug testing as well as random testing to ensure the safety
of our employees, your employees, and your equipment. We train
to do the job right the first time, every time. Additionally,
each project is managed within the context of safety to meet
industry and governmental standards.
Short
Notice Relocations
Did someone
else drop the ball? If they forgot to plan ahead or did not
get the right equipment, tradesmen, or if they just quit, then
BES can help complete the project.
|